St. Clair River traffic (2014-08-02 & 08-07)

Post a reply


BBCode is ON
[img] is ON
[url] is ON
Smilies are OFF

Topic review
   

If you wish to attach one or more files enter the details below.

Maximum filesize per attachment: 3 MiB.

Expand view Topic review: St. Clair River traffic (2014-08-02 & 08-07)

St. Clair River traffic (2014-08-02 & 08-07)

by Bookworm » August 7, 2014, 7:32 pm

Discovered a couple of pics from last week when I downloaded today's traffic.
Attachments
Tug Gregory J. Busch refueling. (Bramble and Lee A. Tregurtha in the background.)
Tug Gregory J. Busch refueling. (Bramble and Lee A. Tregurtha in the background.)
Lee A. Tregurtha down-bound to the Rouge plant with taconite
Lee A. Tregurtha down-bound to the Rouge plant with taconite
Pushing its barge to Ludington
Pushing its barge to Ludington
Destination Cheboygan
Destination Cheboygan
At the fuel dock
At the fuel dock
After moving away from the dock it started turning down-river
After moving away from the dock it started turning down-river
Looks like she'll run into the Canadian shore
Looks like she'll run into the Canadian shore
Blocking the channel
Blocking the channel
Pilot house passing as she gets up speed and heads for Quebec City
Pilot house passing as she gets up speed and heads for Quebec City
In ballast to Two Harbors
In ballast to Two Harbors
Unspecified cargo for Sorel
Unspecified cargo for Sorel
Liquid cargo for Nanticoke
Liquid cargo for Nanticoke
Up-bound, in ballast, to Goderich
Up-bound, in ballast, to Goderich
Loaded with taconite from Marquette and going to the Rouge plant
Loaded with taconite from Marquette and going to the Rouge plant
First stop Montreal and then on across the Atlantic
First stop Montreal and then on across the Atlantic

Top