DMIR loading?

Discussion board focusing on Great Lakes Shipping Question & Answer. From beginner to expert all posts are welcome.
pcolachap
Posts: 357
Joined: March 16, 2010, 2:03 pm

Re: DMIR loading?

Unread post by pcolachap »

Hello again. Belay my last on the BFT. They load that at the Hallet dock across the slip from old DMIR #5. The Joe Block has loaded Hearth Layered Chips from the shutes at the outer end of #6. Mike
pcolachap
Posts: 357
Joined: March 16, 2010, 2:03 pm

Re: DMIR loading?

Unread post by pcolachap »

The dock could if they had the personnel available to handle both the conveyor system on the near end of the dock and the shoots on the outer end at the same time. The shoots are used for ores that don't flow well or raw taconite, sometimes called Blast Furnace Trim (BFT). Mike
Guest

DMIR loading?

Unread post by Guest »

Can the DMIR dock in Duluth load 2 boats at once?

I notice the Thunder Bay and Roger Blough are there this morning. I saw the Thunder Bay racing up the St. Clair River in a big hurry.
Post Reply