Wisconsin Electric

Post a reply


BBCode is ON
[img] is ON
[url] is ON
Smilies are OFF

Topic review
   

If you wish to attach one or more files enter the details below.

Maximum filesize per attachment: 3 MiB.

Expand view Topic review: Wisconsin Electric

Re: Wisconsin Electric

by I19head » December 24, 2023, 9:34 am

The Pulliam Power Plant that removed was in Green Bay.

Re: Wisconsin Electric

by D Estep » December 24, 2023, 8:34 am

Guest wrote: December 21, 2023, 9:53 am Marquette was a huge consumer of water borne coal.
The Marquette coal run must have been a nice contract to have. Unload the coal, load taconite pellets. $$$$$$$$

Re: Wisconsin Electric

by I19head » December 23, 2023, 9:14 pm

The power plant was idled several years ago and removed. Some coal is still delivered to the Reiss dock but at a much reduced level than in the past.

Re: Wisconsin Electric

by Guest » December 21, 2023, 9:53 am

Marquette was a huge consumer of water borne coal.

Wisconsin Electric

by Guest » December 19, 2023, 11:58 pm

Much coal was shipped from Chicago to Wisconsin Electric by boat for decades. I am familiar with plants at Oak Creek, Milwaukee, and Port Washington. Were there any more WE plants? Are the plants still using coal? Boat deliveries ended years ago with the use of unit trains directly to the station. Are the generating plants at Sheboygan and Green Bay still burning coal?

Top