Frontenac's load

Post a reply


BBCode is ON
[img] is ON
[url] is ON
Smilies are OFF

Topic review
   

If you wish to attach one or more files enter the details below.

Maximum filesize per attachment: 3 MiB.

Expand view Topic review: Frontenac's load

Re: Frontenac's load

by Guest » September 17, 2010, 9:14 am

well it never really closed. the coal side wasnt operating but the dock has handled ore all along. i guess this coke is a trial to see how efficient it can be handle from point A to B. I used to work there and thats about all the scoop I know cause I dont talk to too many there now

Re: Frontenac's load

by standuffer » September 16, 2010, 3:25 pm

Loading in Conneaute? When did that dock open back up?

Re: Frontenac's load

by Southdown » September 16, 2010, 1:44 pm

Brad wrote:Where will the Frontenac be unloading it's coke after being loaded in Conneaut last night?
Nanticoke.

Frontenac's load

by Brad » September 16, 2010, 11:54 am

Where will the Frontenac be unloading it's coke after being loaded in Conneaut last night?

Top