St. Clair River

Post a reply


BBCode is ON
[img] is ON
[url] is ON
Smilies are OFF

Topic review
   

If you wish to attach one or more files enter the details below.

Maximum filesize per attachment: 3 MiB.

Expand view Topic review: St. Clair River

St. Clair River

by Bookworm » May 8, 2016, 7:50 pm

Two totally different ships passed my lens this morning.
Attachments
Sunrise found Happy Ranger and Mesabi Miner in the Lake Huron Anchorage.
Sunrise found Happy Ranger and Mesabi Miner in the Lake Huron Anchorage.
American Integrity still at the RECOR Power Plant.
American Integrity still at the RECOR Power Plant.
Mesabi Miner left anchorage, headed down river, and began waiting for her turn at RECOR.
Mesabi Miner left anchorage, headed down river, and began waiting for her turn at RECOR.
Her cargo of windmill blades was delivered in Bay City, and by mid-morning Happy Ranger left the anchorage, down-bound to Hamilton.
Her cargo of windmill blades was delivered in Bay City, and by mid-morning Happy Ranger left the anchorage, down-bound to Hamilton.

Top