Bethlehem Steel built the Cort for service between Taconite Harbor and Burns Harbor, but later settled into a Superior to BH routine. I wasn't aware that she loaded at TH in 2001. Do you have the dates(s)?silver bay wrote:the cort loaded at taconite harbor about 20 miles north of here in april 2001 before they shutdown
Stewart Cort in Silver Bay
Re: Stewart Cort in Silver Bay
Re: Stewart Cort in Silver Bay
the cort loaded at taconite harbor about 20 miles north of here in april 2001 before they shutdown
Stewart Cort in Silver Bay
When was the last time they loaded anywhere besides Superior, Wisconsin ? TIA