CortLoadingInSuperior

Open forum for regional discussion. (extension of the Information Search page for off topic & personal discussion)
Chris M
Posts: 704
Joined: July 28, 2009, 10:30 pm

Re: CortLoadingInSuperior

Unread post by Chris M »

The BN dock also has alot of issues itself.
Al

Re: CortLoadingInSuperior

Unread post by Al »

If they still load half the silos with one type of ore and the other side with another, they have to recharge the dock with the right ore which can take time. The Cort also used to run into problems at times pumping ballast. When I worked aboard the Cort, it was not unheard of to spend that much time at the dock.
garbear

Re: CortLoadingInSuperior

Unread post by garbear »

I've also noticed that at the CN docks here in West Duluth. The American Integrity loaded there a couple days ago and it was there for over 24 hours. Don't know what the stockpile situation is like there. Haven't driven out that way since spring.
Darryl

CortLoadingInSuperior

Unread post by Darryl »

The Cort went into the BN dock earlier yesterday and is leaving the following day now at about 0800. Wonder why the long loading time. Maybe they're low on pellets. Also, for the first time I notice the white exhaust on her. She's like a thousand foot steamer!
Post Reply